The construction techniques of the various bureaus of China Railway are also diverse and have not yet formed a unified technical specification. Some high-speed railway project departments work like this:
1. The super-elevation part of prefabricated beams and cast-in-situ beams can be found out with a ruler first, and the error value can be marked with chalk or paint.
2. Use a small milling machine for rough grinding within the delineated range. Electric gasoline milling machines can be used, depending on the on-site power supply conditions. The small milling machine can mill (grind) about 3-5mm of the beam surface at a time, and it can also grind 1-2 cm after repeated milling. Of course, for beams with large elevation errors, you can buy a larger milling machine with a milling depth of about 10mm at a time.
3. After rough grinding of the milling machine, measure the elevation, if the depth is not enough, continue milling.
4. After the elevation measurement is qualified, use a grinder for fine grinding and finishing.